Photo report from the construction site of the SYMBOL residential complex for September 2023 from the Credo company:
The vertical structures of the 9th floor have been completed
The floor slab of the 9th floor was concreted
Works are underway to install vertical structures of the 10th floor
The brickwork of inter-apartment and interior walls on the 6th-7th floors has begun
We continue to work on the installation of the retaining wall